A release carries a rollout percentage between 0 and 100. The server decides per device whether that device is inside the slice.

bucket = sha256(deviceId + ":" + releaseId) % 10000
offered when bucket < round(rolloutPercent * 100)

The digest is taken over the UTF-8 string deviceId:releaseId; the bucket is the first 8 hex characters read as an integer, modulo 10,000. Ten thousand buckets is what makes 0.01% a meaningful number. rolloutPercent >= 100 and <= 0 short-circuit before any hashing.

There is no release × device table. Nothing is written when a device is admitted to a rollout, nothing is read to decide, and the answer for a given pair never changes. That has three consequences worth stating plainly:

  • Cost does not grow with the rollout. Admitting a million devices to a release costs the same as admitting ten, because admission is a hash, not a row.
  • The answer is stable across servers and restarts. Any instance computes the same bucket, so a rollout behaves identically behind a load balancer or after a redeploy.
  • You can reason about it offline. Given a device id and a release id, you can compute by hand whether that device is in.

The release id is in the hash, not just the device id. Without it, a device with a low bucket would be in the first 1% of every release forever — your canary group would be the same few thousand people, and the same few thousand people would eat every bad build.

With it, membership is re-drawn per release. A device that received yesterday’s canary is no more likely than any other to receive today’s.

The bucket is fixed and the threshold moves, so raising a percentage only ever widens the set. A device that was offered a release at 10% is still offered it at 25%. Nobody is pulled off a build they already have.

Lowering is not the reverse. It narrows the set of devices that would be offered the release, but a device already running it keeps it. The update-check makes that explicit — before it looks at status or rollout, it checks whether the candidate is the release the device is already on:

// Sticky: a device already on a release keeps it even once the rollout is
// paused. Only `disabled` pulls devices off a release they already run.
if (row.id === query.current) {
target = row;
break;
}

Set a release to 0% and the devices already on it stay on it. To actually take a release back you have to disable it — see Rollback.

Both interfaces say this out loud rather than letting a shrinking number imply a recall:

Terminal window
ota rollout v42 10
! Lowering 25% → 10% stops new devices only; devices already on v42 keep it.
✔ v42 (ios) is now at 10%.

The dashboard slider does the same. Moving it opens a confirmation that names the old and new values, with a warning tone when the number goes down.

--mandatory at publish time changes when an update takes effect, not who gets it. The rollout percentage still decides who is offered it.

A normal release downloads in the background, is staged in the free slot, and becomes live on the next launch. A mandatory release reloads as soon as the download and verification finish, so the user is on it within the session. Use it for a release that fixes something you cannot leave running, and be aware that a reload discards whatever in-memory state the app had.

The flag lives on the release row and the admin API accepts a change to it later, so a release can be made mandatory after the fact — the devices that already installed it are unaffected, and the ones that have not yet will reload on arrival.

Terminal window
ota publish -c production --rollout 5 # publish narrow
ota metrics -c production # read the funnel
ota rollout v42 25 # widen
ota rollout v42 100 # ship it

Nothing about the release changes between those steps — same bytes, same digest, same manifest. Only the threshold moves.